Oahu road work starts up again today

Road Work

Here’s the upcoming schedule of road work on Oahu starting after the Labor Day Monday holiday:

(Lane closure schedules may change at any time without further notice. All projects are weather permitting.)

— H-1 FREEWAY —

KAPOLEI TO EWA BEACH
8 p.m-3:30 a.m. Tuesday through Friday: Single lane closure on the H-1 Freeway in the eastbound direction between Kualakai Parkway and Fort Weaver Road for overhead sign work.

HONOLULU 
9 p.m.-4 a.m. Tuesday through Friday: Lane closures on the H-1 Freeway in both directions between Keeaumoku Street and Pali Highway for overhead sign work.

10 p.m.-4 a.m. Wednesday: Likelike Highway off-ramp (Exit 20A) will be closed in the eastbound direction.

WAIMALU TO WAIPAHU

7:30 p.m.-4:30 a.m. Tuesday through Friday: Two to three right lanes closed on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu off-ramp (Exit 10) and the Waipahu off-ramp (Exit 8B) for road widening and utility installations.

5) WAIMALU TO WAIPAHU 

9:30 a.m.-2:30 p.m. Tuesday through Friday: One right lane closed on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu off-ramp (Exit 10) and the H-1/H-2 split for road widening and utility installations.

— H-2 FREEWAY —

WAIPIO
8:30 p.m.-4 a.m. Tuesday through Thursday: Lane closure on the H-2 Freeway in the Honolulu-bound direction between the Ka Uka Boulevard off-ramp (Exit 2) and the Waiawa Road overpass for the rail project.

— H-201 MOANALUA FREEWAY —

AIEA
8:30 a.m.-3 p.m. Thursday and Friday: Left lane closure on H-201 Moanalua Freeway in the westbound direction, between the H-201 Moanalua Freeway and Kamehameha Highway merge and Kaonohi Street for the rail project.

MOANALUA
9 a.m.-3 p.m. Thursday: Full closure of Ala Aolani Street at North Frontage Road off the H201 Moanalua Freeway for utility pole replacement. Detours will be implemented.

— FARRINGTON HIGHWAY —

WAIANAE
8:30 a.m.-3 p.m. Tuesday through Friday: Lane closures on Farrington Highway in the westbound direction between Waianae Valley Road and Bayview Street for utility maintenance.

MAKAHA
8 a.m.-3 p.m. Tuesday through Friday: Right lane closure in the southbound direction on Farrington Highway between Makau Street and Water Street for utility repairs.

— KALANIANAOLE HIGHWAY —

HAWAII KAI
8:30 a.m.-3 p.m. Tuesday through Friday: Lane closures on Kalanianaole Highway in the eastbound direction between East Halemaumau Street and Paeoki Drive for cold planning and resurfacing as part of the Kalanianaole Highway Resurfacing project. Left turns are permitted up to West Halemaumau Street, and U-turns are permitted at Kawaihae Street.

— KAMEHAMEHA HIGHWAY —

LANIAKEA
8 a.m.-1:30 p.m. Tuesday and Wednesday: Lane closure on Kamehameha Highway in the northbound direction between Papailoa Road and Pohaku Loa Way for soil testing.

PEARL CITY
8:30 a.m.-3:30 p.m. Tuesday through Friday: Left lane closure on Kamehameha Highway in both directions between Puu Momi Street and Kuleana Road for deck widening.

WAIPIO
8:30 a.m.-3 p.m. Tuesday through Friday: Alternating lane closure on Kamehameha Highway in both directions between Ka Uka Boulevard and Lanikuahana Avenue for soil testing.

MILILANI
8:30 a.m.-3 p.m. Tuesday through Friday: Lane closure on Kamehameha Highway in the southbound direction at the intersection of Kamehameha Highway and Lumiaina Street, between Ka Uka Boulevard and Waipahu Street, and partial closures in the northbound direction between Lanikuhana Avenue and Waihau Street, both for utility installations. Motorists are advised to expect traffic delays and use alternate roadways such as Meheula Parkway, Ka Uka Boulevard and the H-2 Freeway.

— LIKELIKE HIGHWAY —

KALIHI
8 a.m.-3 p.m. Tuesday through Friday: Right lane closure in the northbound (Kaneohe-bound) direction between North School Street and Kono Street for sewer maintenance.

— NIMITZ HIGHWAY —

HONOLULU 
8 p.m.-3:30 a.m. Monday through Friday: Left lane closure on Nimitz Highway in the eastbound direction between Pacific Street and Sumner Street for utility maintenance.

8:30 a.m.-3 p.m. Tuesday through Friday: Right lane closure on Nimitz Highway in the westbound direction between Waiakamilo Road and Kalihi Street for concrete repairs.

8:30 p.m.-4 a.m. Tuesday through Thursday: Lane closures on Nimitz Highway in the westbound direction between South Street and Bishop Street for pavement repairs.

8:30 a.m.-3 p.m. Tuesday through Friday: Right lane closure on Nimitz Highway in the eastbound direction between Lagoon Drive and Sand Island Access Road for utility replacement.

— PALI HIGHWAY —

NUUANU 
6 a.m.-2 p.m. Saturday: Right lane closure on the Pali Highway in the southbound direction between the tunnels and Waokanaka Street for road maintenance.

— ALA MOANA BOULEVARD —

HONOLULU
8:30 a.m.-2:30 p.m. Tuesday through Friday: Right lane closed on Ala Moana Boulevard in the westbound direction onto between Cooke Street and Coral Street for utility repairs.

8:30 a.m.-3 p.m. Tuesday through Friday: Lane closure on Ala Moana Boulevard in the westbound direction between Kahanamoku Street and Hobron Lane for road repairs.

— VINEYARD BOULEVARD —

HONOLULU
8:30 a.m.-3 p.m. Tuesday through Friday: Single left lane closure on Vineyard Boulevard in the eastbound direction between Palama Street and Pua Lane for median and curb reconstruction.

8:30 a.m.-3 p.m. Tuesday through Friday: Lane closures on Vineyard Boulevard in both directions between Liliha Street and Punchbowl Street for median and pavement repairs.

8:30 a.m.-3 p.m. Thursday and Friday: Left turn lane closed on Vineyard Boulevard in the eastbound direction at the Liliha Street intersection for pavement reconstruction.

8:30 a.m.-3 p.m. Thursday and Friday: Lane closure on Vineyard Boulevard in the westbound direction at the Waipa Lane intersection for the Vineyard Boulevard Resurfacing project.

The project will resurface 10.5 lane miles from Palama Street to the H-1 Freeway on-ramp. The repairs include sidewalks, curbs, gutters, installing bus pads, replacing existing traffic signal heads, energy-efficient, LED optical units, extending left turn lanes at the Palama Street and Liliha Street intersections, and landscaping.

— KANEOHE BAY DRIVE —

KANEOHE
8:30 a.m.-3 p.m. Tuesday through Friday: Single lane closure on Kaneohe Bay Drive in both directions between Kamehameha Highway and Nanamoana Street for the Kaneohe Bay Drive Rehabilitation Project.

— LILIHA STREET —

KALIHI
8:30 a.m.-3 p.m. Tuesday through Friday: Right lane closed on Liliha Street in the northbound, direction between North Vineyard Street and North Kuakini Street for water main installations.

— QUEEN STREET —

HONOLULU 
7:30 p.m.-4:30 a.m. Tuesday through Thursday: Lane closures on Queen Street in the westbound direction between Fort Street and Nimitz Highway for pavement repairs.

— KUNIA ROAD —

VILLAGE PARK
8:30 a.m.-3 p.m. Tuesday through Friday: Single lane closure on Kunia Road in both directions between Plantation Road and Kupuna Loop for asphalt paving.

For more information, please visit www.pmcontraflow.com or call (808) 945-1144.

blog comments powered by Disqus