Work schedule for Kapiolani Blvd. water project: March 9-13

The Board of Water Supply’s (BWS) contractor for the project on Kapiolani Boulevard will be continuing their work to install necessary manholes and fire hydrants needed to upgrade the water system servicing the area.

Work is scheduled to take place on Kapiolani Boulevard between McCully Street and Hoawa Street. Motorists are advised to expect the following traffic modifications:

8:30 a.m.-3:30 p.m. Monday and Tuesday:

  • The closure of the far right and center Diamond Head-bound lanes of Kapiolani Boulevard between McCully Street and Paani Street.

8:30 a.m.-3:30 p.m. Wednesday through Friday:

  • The closure of the far left and center Diamond Head-bound lanes of Kapiolani Boulevard between Paani Street and Hoawa Street.

The indicated lane closures may be modified based on project needs.

The contractor is replacing approximately 2,800 feet of 12-inch water main installed in 1938 and approximately 1,000 feet of 8-inch water main installed in 1953.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s