Road Work for the Week, Dec. 4-9

PLEASE NOTE: Lane closure schedules may change at any time without further notice. All projects are weather permitting.

— H-1 FREEWAY —

AIEA
9:30 a.m.-1 p.m. Friday: Roving left lane closure in the eastbound direction between the Pearlridge/Waimalu Off-Ramp (Exit 10) and the Kaimakani Street Overpass for maintenance work.

9:30 a.m.-2 p.m. Wednesday through Thursday: Two right lanes closed in the westbound direction between the Pearl City/Waimalu Off-Ramp (Exit 10) and the Waipahu Off-Ramp (Exit 8B) for roadway and deck maintenance.

EWA (NIGHT WORK)
8:30 p.m.-4:30 a.m. Monday through Friday morning: Lane closures in the eastbound direction at the Fort Weaver Road Underpass for maintenance work.

8:30 p.m.-4:30 a.m. Monday through Friday morning: Lane closure on the Fort Weaver Road On-Ramp to the freeway in the eastbound direction for maintenance work.

8:30 p.m.-4:30 a.m. Monday through Friday morning: Lane closure on the Kunia Road On-Ramp to the freeway in the westbound direction for maintenance work.

HONOLULU
8:30 a.m.-12:30 p.m. Wednesday: Right lane closure on the King Street Off-Ramp (Exit 25A) from the freeway in the eastbound direction for maintenance work.

9 p.m.-3:30 a.m. Sunday through Friday morning: Lane closures in both directions between the Kinau Street Off-Ramp (Exit 22) and the Kapiolani Interchange for maintenance work.

9 a.m.-3 p.m. Monday through Friday: Shoulder closure on the Vineyard Boulevard On-Ramp to the freeway in the eastbound direction for trench work and a concrete pour.

8 a.m.-1:30 p.m. Monday: Closure of the Bingham Street Off-Ramp (Exit 24A) from the freeway in the eastbound direction for maintenance work.

HONOLULU TO PEARL CITY (NIGHT WORK)
9 p.m.-4 a.m. Thursday through Friday morning: Two to three left lanes closed in the westbound direction between Zipper Hale and the H-1/H-2 Split for restriping of the Zipper lane.

KALIHI TO WAIKELE
8:30 a.m.-1 p.m. Monday: Left lane closure in the westbound direction between the Keehi Interchange and the Managers Drive Overpass for maintenance work.

PEARL CITY
9 p.m.-4:30 a.m. Sunday through Monday and Wednesday through Thursday: Up to four lanes closed in the westbound direction between the Kaahumanu Street Overpass and the H-1/H-2 Split for the rail project.

9 p.m.-3 a.m. Sunday through Monday and Wednesday through Thursday: Up to four lanes closed in the eastbound direction between the H-1/H-2 Merge and the Kaahumanu Street Overpass for the rail project.

9 p.m.-3:30 a.m. Tuesday: Right lane closure in the eastbound direction between the H-1/H-2 Split and the Kaahumanu Street Overpass for the rail project.

WAIKELE
9 a.m.-3 p.m. Monday through Friday: Shoulder closure on the Paiwa Street On-Ramp to the freeway in the eastbound direction for trench work and a concrete pour.

WAIPAHU
8:30 a.m.-3 p.m. Monday through Friday: Shoulder closure in the westbound direction between the Paiwa Street Underpass and the Managers Drive Overpass for slope repair work.

— H-2 FREEWAY —

WAIPIO
9 p.m.-4:30 a.m. Sunday through Friday morning: On-Ramp and Off-Ramps from Ka Uka Boulevard to the freeway will be closed in both directions for maintenance repairs. One ramp will be closed at a time.

8:30 a.m.-3 p.m. Monday through Friday: Shoulder closures on the Ka Uka Boulevard On-Ramp to the freeway in the southbound direction for slope stabilization work.

— H-201 MOANALUA FREEWAY —

AIEA
8:30 a.m.-3:30 p.m. Monday through Tuesday and Thursday through Friday: Right lane closure in the eastbound direction between Kamehameha Highway and the Aiea Access Road Overpass for the rail project.

HALAWA (WEEKEND/NIGHT WORK)
8 p.m.-7 a.m. Sunday through Friday morning: Closure of the Kamehameha Highway On-Ramp from the freeway in the westbound direction for the rail project.

9 p.m.-4 a.m. Sunday through Friday morning: Closure of the Kamehameha Highway On-Ramp to the freeway in the eastbound direction for the rail project.

8:30 p.m.-4:30 a.m. Sunday through Friday morning: Lane closure on the Kaneohe Off-Ramp (Exit 1C) from the freeway for maintenance work.

— FARRINGTON HIGHWAY —

MAKAHA
8:30 a.m.-1 p.m Monday through Friday: Roving lane closure in both directions between Makau Street and Makua Beach for maintenance work.

MOKULEIA
8:30 a.m.-2 p.m. Monday: Right lane closure in both directions between Mahinaai Street and Mokuleia Beach Park for maintenance work.

WAIANAE
9 a.m.-3 p.m. Monday through Friday: Shoulder closure in the eastbound direction between Lualualei Homestead Road and Ala Poko Street for maintenance work.

WAIPAHU
8:30 a.m.-2:30 p.m. and 8 p.m.-2 a.m. Monday through Tuesday: Lane closure in the westbound direction between Awanui Street and Awalau Street for underground utility replacements by Hawaiian Electric.

Lane closure on in both directions between Kahualii Street and the Kamehameha Highway Overpass for the rail project.

  • Westbound lane will be closed from 7 a.m. to 3:30 p.m.
  • Eastbound lane will be closed from 8:30 a.m. to 5:30 p.m.

— JOSEPH P. LEONG HIGHWAY —

HALEIWA
7:30 a.m.-12 p.m. Wednesday through Friday: Roving lane closure in both directions for maintenance work.

— KALANIANAOLE HIGHWAY —

AINA HAINA
8:30 a.m.-3 p.m. Monday through Friday: Right lane closure on Kalanianaole Highway/H-1 Freeway in the eastbound direction between the 21st Avenue Underpass and West Hind Drive for maintenance work.

KAILUA
8:30 a.m.-3 p.m. Monday through Friday: Right shoulder lane closure in the eastbound direction between Ulupii Street and Old Kalanianaole Road for slope stabilization work.

WAIMANALO
8:30 a.m.-3 p.m. Monday through Friday: Lane closure in the Kailua-bound direction between Saddle City Road and Flamingo Street for retaining wall work. Traffic will be contraflowed during this time.

— KAMEHAMEHA HIGHWAY —

HALAWA
8 p.m.-7 a.m. Monday and Wednesday through Friday: Right lane closure in the westbound direction between Kalaloa Street and Salt Lake Boulevard for the rail project.

7 a.m.-3:30 p.m. Monday through Tuesday and Thursday through Friday: Right lane closure in the westbound direction between Kohomua Street and Salt Lake Boulevard for the rail project.

8 p.m.-5 a.m. Monday and Wednesday through Friday night: Left turn lane closed in the eastbound direction at the Salt Lake Boulevard Intersection for the rail project.

HALEIWA
7:30 a.m.-1 p.m. Monday through Thursday: Roving lane closure on Kamehameha Highway/Kaukonahua Road in both directions between Farrington Highway and Joseph P. Leong Highway for maintenance work.

HALEIWA TO KAHALUU
8 a.m.-2 p.m. Monday through Friday: Roving lane closure in both directions between Waialua Beach Road and Kahekili Highway for maintenance work.

KAAAWA
8:30 a.m.-3 p.m. Monday through Friday: Lane closure in the southbound direction between Kaaawa Place and Kaaawa Valley Road for waterline relocation work. Traffic will be contraflowed through the open lane.

KAHUKU
8:30 a.m.-3 p.m. Monday through Friday: Lane closure in both directions between Pahipahialua Street and Dairy Road for road repaving. Traffic will be contraflowed.

8:30 a.m.-3 p.m. Monday through Friday: Alternating lane closure in both directions approximately 900 feet east of Charlie Road for guardrail installations. Traffic will be contraflowed.

KANEOHE
8:30 a.m.-3 p.m. Tuesday: Lane closure in the southbound direction between Mahinui Road and Halekou Road for pole replacements.

7:30 a.m.-1:30 p.m. Monday through Friday: Roving lane closure in both directions between Kaneohe Bay Drive and the Pali Highway for maintenance work.

8:30 a.m.-3 p.m. Monday through Friday: Right lane closure in the eastbound direction between the H-3 Freeway Overpass and the Pali Highway for tree trimming.

LAIE
8:30 a.m.-12:30 p.m. Monday: Right lane closure in the northbound direction between Hale Laa Boulevard and Lanihuli Street for maintenance work.

MILILANI
8:30 a.m.-3 p.m. Monday through Friday: Lane closures in both directions between Ka Uka Boulevard and Waihau Street for guardrail work, fencing, shoulder improvements, and slope repairs. One lane in both directions will be open for motorists at all times. Motorists are advised to expect traffic delays and use alternate roadways such as Kuahelani Avenue, Meheula Parkway, Lanikuhana Avenue, Ka Uka Boulevard and the H-2 Freeway.

PEARL HARBOR
8:30 a.m.-2:30 p.m. Monday through Tuesday and Thursday through Friday: Lane closures in the westbound direction between Center Drive and Makalapa Road for the rail project.

8:30 a.m.-6 p.m. Monday through Tuesday and Thursday through Friday: Two left lanes closed in the eastbound direction between Arizona Street and Center Drive for the rail project.

WAHIAWA
8 p.m.-1 a.m. Monday through Thursday: Roving lane closure in both directions between Avocado Street and Whitmore Avenue for maintenance work.

WAIKELE
8:30 a.m.-3 p.m. Monday through Friday: Lane closure in the southbound direction between Lumiaina Street and Lumiauau Street for maintenance work.

— LIKELIKE HIGHWAY —

HONOLULU
7 a.m.-1 p.m. Monday through Friday: Roving lane closure in the Honolulu-bound direction between the Wilson Tunnel and Nalanieha Street for maintenance work.

KALIHI
7:30 a.m.-3:30 p.m. Monday through Friday: Alternating lane closures in both directions between School Street and Emmeline Place for survey work and roadside reconstruction.

KANEOHE
7:30 a.m.-1:30 p.m. Monday through Friday: Roving lane closure in both directions between the Wilson Tunnel and Kamehameha Highway for maintenance work.

— NIMITZ HIGHWAY —

HONOLULU
7 a.m.-1 p.m. Friday: Roving lane closure on Nimitz Highway/Ala Moana Boulevard in both directions between Sand Island Access Road and Kalakaua Avenue for maintenance work.

8 a.m.-1:30 p.m. Tuesday through Thursday: Roving lane closure on Nimitz Highway/Ala Moana Boulevard in the eastbound direction between Waiakamilo Road and Atkinson Drive for maintenance work.

7 a.m.-12 p.m. Thursday: Roving lane closure in the westbound direction at the Ahua Street Intersection for maintenance work.

9 a.m.-3 p.m. Monday through Friday: Alternating lane closure in both directions between Alakawa Street and Waiakamilo Road for underground utility maintenance.

8 p.m.-3 a.m. Monday through Thursday morning: Lane closure in the westbound direction at the Puuloa Road Intersection for maintenance work.

8:30 a.m.-3 p.m. Monday through Friday: Right lane closure in the westbound direction between River Street and Sumner Street for maintenance work.

8:30 a.m.-3 p.m. Monday through Friday: Lane closure in both directions between Sumner Street and Alakawa Street for maintenance repairs.

— PALI HIGHWAY —

MAUNAWILI
7:30 a.m.-1:30 p.m. Monday through Friday: Roving lane closure in both directions between the Pali Tunnel and Kamehameha Highway for maintenance work.

— ALA MOANA BOULEVARD —

HONOLULU
8:30 a.m.-3 p.m. Monday through Friday: Right lane closure in the westbound direction between Atkinson Drive and Piikoi Street for maintenance work.

8:30 a.m.-3 p.m. Monday through Friday: Lane closure in the eastbound direction between Ward Avenue and Kamakee Street for maintenance work.

8:30 a.m.-3 p.m. Monday through Friday: Lane closure in the eastbound direction between Kahanamoku Street and Kalia Road for sewer maintenance.

8 p.m.-3 a.m. Monday through Friday morning: Lane closure in both directions between Cooke Street and Punchbowl Street for underground utility maintenance.

8:30 a.m.-3 p.m. Monday through Friday: Right lane closure in the westbound direction between Queen Street and Cooke Street for maintenance work.

— KAPIOLANI BOULEVARD —

HONOLULU
8:30 a.m.-3 p.m. Monday through Friday: Right lane closure in the westbound direction at the Kaimuki Avenue Intersection for maintenance work.

— VINEYARD BOULEVARD —

HONOLULU
8:30 a.m.-3 p.m. Monday through Friday: Lane closure in both directions between River Street and Maunakea Street for tree trimming.

— KANEOHE BAY DRIVE —

KANEOHE
7:30 a.m.-1:30 p.m. Monday through Friday: Roving lane closure in both directions between Mikiola Drive and Kamehameha Highway for maintenance work.

8:30 a.m.-3 p.m. Monday through Friday: Lane closure in both directions at the Puohala Street Intersection for traffic signal improvements.

— WHITMORE AVENUE —

WAHIAWA
8 a.m.-1 p.m. Monday through Thursday: Roving lane closure in both directions between Kamehameha Highway and Center Street for maintenance work.

— KUALAKAI PARKWAY —

KAPOLEI
8:30 a.m.-3:30 p.m. Monday through Friday: Lane closure in the westbound between the H-1 Freeway Overpass and Kapolei Parkway for the rail project.

9:30 a.m.-2 p.m. Monday through Thursday: Alternating lane closure in both directions between Kapolei Parkway and the H-1 Freeway Overpass for maintenance work.

—KAUKONAHUA ROAD —

WAIALUA
7:30 a.m.-12 p.m. Wednesday through Friday: Roving lane closure in both directions between Farrington Highway and Kamehameha Highway for maintenance work.

— FORT WEAVER ROAD —

EWA BEACH
9:30 a.m.-2 p.m. Monday through Friday: Alternating lane closure in both directions between the H-1 Freeway Overpass and Ewa Beach Road for maintenance work.

— KAMANANUI ROAD —

WAHIAWA
8 a.m.-1 p.m. Monday: Roving lane closure in both directions between Wilikina Drive and Kaukonahua Road for maintenance work.

— KUNIA ROAD —

VILLAGE PARK TO WAHIAWA
8 a.m.-1 p.m. Monday through Friday: Roving lane closure in both directions between the H-1 Freeway Overpass and Wilikina Drive for maintenance work.

— LILIHA ACCESS ROAD —

HONOLULU
8:30 a.m.-3 p.m. Monday through Friday: Alternating lane closures in both directions between North School Street and Liliha Street for striping and utility installations.

— PUULOA ROAD —

HONOLULU
8 p.m.-3 a.m. Monday through Thursday morning: Lane closure on Puuloa Road/Lagoon Drive in both directions at the Kilihau Street Intersection for maintenance work.

— ALA IKE STREET —

PEARL CITY
7:30 a.m.-3:30 p.m. Monday through Friday: Alternating lane closure in both directions for the rail project.

— AOLELE STREET —

HONOLULU
8 p.m.-5 a.m. Sunday through Monday morning: Lane closure in the westbound direction between Lagoon Drive and Aolewa Place for the rail project. Traffic will be contraflowed.

9 a.m.-3:30 p.m. Thursday through Friday: Lane closure in the westbound direction between Lagoon Drive and Aolewa Place for the rail project. Traffic will be contraflowed.

— KAHUAPAANI STREET —

HALAWA
8:30 a.m.-2 p.m. Tuesday and Thursday through Friday: Right lane closure in the northbound direction between Salt Lake Boulevard and Ulune Street for maintenance work.

— KINALAU PLACE —

HONOLULU
9 a.m.-3 p.m. Wednesday through Friday: Lane closure for trench work and a concrete pour.

— LILIHA STREET —

HONOLULU
8:30 a.m.-3 p.m. Monday through Friday: Alternating lane closures in both directions between North School Street and North King Street for the Liliha Street Rehabilitation project.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s